Robert worked out this detail at the front wall of the lower office. Since the concrete foundation wall is thicker than the stud wall, it would have left a ledge that probably wouldn't have looked so good. Instead, Robert had Chris (CMP Foundations) run this detail along the edge. A nice touch, and I wouldn't have known to ask for it. Thanks guys!

No comments:
Post a Comment