
This pic is from the upper floor level. I'm standing in front of the upper floor garages, looking down at the second floor level. The building lot is essentially a terraced hillside.

They have to dig down for the lowest level (third floor). They'll be taking out tons of dirt on Monday and setting the forms for the foundation. The concrete pour is set for Wednesday!
Edit: the concrete pour is not Wednesday - the concrete prep begins. They'll place the forms first, then pour concrete next week-ish.
No comments:
Post a Comment